DGNB Certification

The most widely recognized rating system in the German market, thanks to its transparent and comparable methodology. As auditors and engineers, we support your project through to the issuance of the certificate.

Request a project check
Request a project check
DGNB Hero Visual

The system at a glance

Embossing
Silver · Gold · Platinum
Usage profiles
Office, education, residential, hotel, retail, shopping center, commercial building, logistics, production, administrative facilities, healthcare buildings
System provider and testing body
System provider: German Sustainable Building Council (DGNB)

Testing body: DGNB conformity assessment
Validity
unlimited

Supported by ibak: More than 100 procedures
Office image ibak 10 1-halftone

Classification

An assessment system that considers planning and operation over the entire life cycle to derive the value of a property. Because the methodology is transparent and comparable, the certificate is highly regarded in the market—by investors, users, owners, and financiers alike.
DGNB 3
Once the system is updated, it will be largely comparable to the new construction system, with lower hurdles for facade quality and a dedicated methodology for accounting for reused components in life cycle assessment (LCA) and life cycle costing (LCC).
DGNB 3

The certificate rarely commands a price premium. It provides access.

Giving a figure like "x euros more per square meter of GFA" would be unprofessional. Based on more than 100 DGNB certification processes, we can be more specific.

Land acquisition

Municipalities sometimes require certification as a condition for land allocation. It doesn't offer a higher return, but it is a prerequisite for the deal to go through.

Funding

One of four accredited certification bodies for the QNG seal. For residential buildings, the eligible loan volume is in the five- to six-figure range. The subsidy is provided via a low-interest loan, so it is only worthwhile if you are taking out a loan and the KfW terms are better than those offered by your local bank.

Leasing

It can increase the rent, depending on the location and the market. More often, it ensures that your property is even considered by prospective tenants.

Financing

Can lead to low-interest loans, usually in combination with other measures. It is more likely that this is a prerequisite for obtaining financing.

Exit

An asset doesn't sell better just because it has a certificate. But Article 8 or 9 funds won't even consider it otherwise.
Wann DGNB passt

When DGNB is the right fit

This is the right choice if you intend to occupy the property yourself, if interior quality is your priority, if you are targeting tenants looking for a higher standard of finish, if you wish to apply for QNG certification, or if your investors and buyers are based in the German market. It is also the right path if you want to champion resource conservation before it becomes a standard market practice.

Wann ein anderes System besser passt

When a different system is a better fit

When you need maximum flexibility for leasing and usage and want to keep your lease agreements free of specific requirements. When you use energy supply contracting models. When you are targeting international tenants with global standards or require English-language documentation. And when you work with the GRESB rating as a portfolio or fund manager.

In these cases, we will discuss LEED, BREEAM, or WELL with you.

The path to certification

Project Check

Is DGNB the right fit, and what level of certification is realistic?

Strategy

Analysis, goals, priorities, roadmap

Measures

Specifications, planning and construction supervision

Certificate

Documentation through to conformity assessment

Duration

Preliminary design to completion

of which approximately 3 years are for planning and procurement, and 3 years for construction
at least 3 years, usually 6-7

Completion to certification

 
4-6 months

What we handle

Auditing throughout the entire process
Simulations for energy, comfort, daylight, and microclimate
Measurements
Life Cycle Assessments (LCA) and Life Cycle Costing (LCC)
Material ecological testing
Coordination of documentation and liaison with the testing body

We are proud of our clients

Südkreuz Berlin

Berlin
View reference
View reference
ca. 30.000
QM GFA
WELL Platin
System

Lighthouse I Tabakquartier

Am Tabakquartier, Bremen
View reference
View reference
approx. 4,100
QM GFA
DGNB Silver+ QNG Plus
System

Glückaufhaus

Rüttenscheider Str. 2, Essen
View reference
View reference
approx. 21,700
QM GFA
LEED O+M
System

Skyper Frankfurt

Taunusanlage 1 60329 Frankfurt am Main
View reference
View reference
approx. 80,000
QM GFA
LEED v4.1 O+M, ARC Score Version 3.0
System

Kastor

Platz d. Einheit 1, 60327 Frankfurt am Main
View reference
View reference
approx. 29,000
QM GFA
LEED O+M
System

Kaufmannshaus

Bleichenbrücke 10, Hamburg
View reference
View reference
approx. 30,500
QM GFA
LEED O+M
System

Upper West

Kantstrasse 164, Berlin
View reference
View reference
approx. 59,700
QM GFA
LEED O+M
System

Upper Zeil, Frankfurt

Zeil 112-114, Frankfurt
View reference
View reference
approx. 19,000
QM GFA
LEED O+M
System

Deutschlandhaus Hamburg

Valentinskamp Hamburg
View reference
View reference
approx. 27,500
QM GFA
LEED BD+C: CS
System

SAP Potsdam

Nedlitzer Straße, Potsdam
View reference
View reference
approx. 57,500
QM GFA
LEED NC v2009
System

Enerparc Hamburg

HafenCity (Kirchenpauerstraße 26)
View reference
View reference
9,575.96
QM GFA
HafenCity Ecolabel, version 3.0
System

Opus 84 Hamburg

Baakenhafen District BF 84 Hamburg
View reference
View reference
approx. 27,500
QM GFA
HafenCity Eco-Label, version 3.0
System

Ipanema Hamburg

Überseering Hamburg
View reference
View reference
approx. 21,000
QM GFA
DGNB NBV15
System

Fuhle 101 Hamburg

Fuhlsbüttler Straße Hamburg
View reference
View reference
approx. 28,600
QM GFA
DGNB MIX15
System

Infinity Office Düsseldorf

Schwannstraße Düsseldorf
View reference
View reference
approx. 23,000
QM GFA
DGNB NBV15.2
System

Hermes Bluefield

Heilbronn, Mainz, Augsburg, Berlin-Southwest, Halle, Hamburg, Münster, Osnabrück
View reference
View reference
approx. 10,700 / 12,700
QM GFA
DGNB NLO15
System

Schönhauser Tor, Berlin

Torstraße 49, Berlin
View reference
View reference
approx. 18,800
QM GFA
BREEAM In-Use
System

PEER I Tabakquartier

Am Tabakquartier, Bremen
View reference
View reference
approx. 2070
QM GFA
DGNB Silver + QNG Plus
System

LUX I Tabakquartier

Am Tabakquartier, Bremen
View reference
View reference
approx. 2,070
QM GFA
DGNB Silver QNG Plus
System

Spreepalais am Dom, Berlin

Anna-Louisa-Karsch-Strasse 2, Berlin
View reference
View reference
approx. 25,000
QM GFA
BREEAM In-Use
System

ALVA I Tabakquartier

Am Tabakquartier, Bremen
View reference
View reference
approx. 2,900
QM GFA
DGNB New Construction + QNG
System

Tabakquartier

Am Tabakquartier, Bremen
View reference
View reference
approx. 193,000
QM GFA
DGNB Silver + QNG Plus
System

W2 Campus

Schockenriedstraße 39A-C, 70565 Stuttgart
View reference
View reference
BS 1+2: approx. 28,000, BS3: approx. 17,400, BS4: approx. 23,700
QM GFA
LEED Platinum
System

SUN Munich

Munich
View reference
View reference
31,905
QM GFA
DGNB New Construction
System

DMK Airport City Bremen

Bremen
View reference
View reference
approx. 21,533
QM GFA
DGNB New Construction
System

Seestern

Am Seestern 1, Düsseldorf
View reference
View reference
approx. 69,800
QM GFA
BREEAM In-Use
System

Frequently Asked Questions

How long is the certificate valid?

Indefinite. However, it becomes less meaningful over the years as legislation overtakes the standards that were in place at the time of certification.

Which certification would you recommend – Silver, Gold, or Platinum?

In more than 100 projects, Gold has almost always been the right choice for both new builds and renovations. Platinum is worth the investment for flagship projects and properties occupied by the companies themselves.

What additional planning fees and construction costs will the DGNB certification incur for us?

This can only be answered after the analysis. Before that, it is impossible to know what quality your property would achieve without the sustainability standards.

When should we involve you?

Best in phase 2, before the designers sign their contracts. We then write the DGNB requirements into the contracts as a client brief.