LEED BD+C New
Construction

The most widely accepted international rating system for new construction and major renovations. We support your project as auditors and engineers through to certification, including handling the energy model.

Request a project check
Request a project check
LEED BD+C hero visual

The system at a glance

Embossing
Certified · Silver · Gold · Platinum
Areas of application
New construction and major renovations: Office, Retail, Hospitality, Healthcare, Schools, Data Centers, Warehouses + Distribution Centers, Mixed Use
System provider and certification body
System provider: US Green Building Council (USGBC)

Certification body: Green Business Certification Inc. (GBCI)
Validity
unlimited

Supported by ibak: 211 LEED projects
Einordnung Leed BD + C

Classification

LEED evaluates new construction and major renovations across categories including site selection, energy, water, materials, indoor environmental quality, and innovation. It has the highest market penetration globally, which is particularly important when dealing with international tenants, investors, or buyers. Documentation for the certification body is submitted in English.

In addition to the procedure for new buildings, there is the Core + Shell variant. It limits the requirements to the structural qualities that the building owner and contractors can influence, and excludes some of the requirements for tenant fit-outs.

The currency used for international comparisons

A figure like "x euros more per square meter of GFA" would be misleading. What we can determine from our processes is more concrete.

Leasing

It can increase the rent, depending on the location and market situation. More often, the certificate ensures that your property is even considered by tenants, even without a higher rent.

Financing

This can lead to reduced-interest loans, usually in combination with other measures. It is more likely that the certificate is a prerequisite for obtaining financing at all. The extent of this impact depends on the equity contribution, and therefore on the risk taken by the lenders.

Exit

An asset does not sell for a higher return simply because it holds a certificate. However, Article 8 or 9 compliant funds will only consider it if it does.

International connectivity

When your tenants or buyers compare properties globally, LEED is the currency they recognize.
System besser passt

When a different system is a better fit

If you want to apply for QNG funding, LEED is not the right path. Four other certification systems are accredited for this purpose. In that case, please talk to us about DGNB or BNK/BNG.

The path to certification

Project Check

Is LEED a good fit, what certification level is realistic, and what is the gap between the current and target state?

Strategy

Goals, priorities, roadmap, and specifications for planning contracts

Measures

Simulations, measurements, life cycle assessments, energy modeling, planning and construction supervision

Certificate

Documentation through to review by GBCI

Duration

Preliminary design to completion

of which approximately 3 years for planning and procurement, 3 years for construction
at least 3 years, maximum 6-7

Completion to certification

 
4-6 months

What we handle

End-to-end process auditing
Simulations
Measurements
Life Cycle Assessments (LCA)
Material ecological assessments
Energy model according to ASHRAE standard
Communication with the system provider, in English
Coordination of documentation and liaison with the testing body

We are proud of our clients

Südkreuz Berlin

Berlin
View reference
View reference
ca. 30.000
QM GFA
WELL Platin
System

Lighthouse I Tabakquartier

Am Tabakquartier, Bremen
View reference
View reference
approx. 4,100
QM GFA
DGNB Silver+ QNG Plus
System

Glückaufhaus

Rüttenscheider Str. 2, Essen
View reference
View reference
approx. 21,700
QM GFA
LEED O+M
System

Skyper Frankfurt

Taunusanlage 1 60329 Frankfurt am Main
View reference
View reference
approx. 80,000
QM GFA
LEED v4.1 O+M, ARC Score Version 3.0
System

Kastor

Platz d. Einheit 1, 60327 Frankfurt am Main
View reference
View reference
approx. 29,000
QM GFA
LEED O+M
System

Kaufmannshaus

Bleichenbrücke 10, Hamburg
View reference
View reference
approx. 30,500
QM GFA
LEED O+M
System

Upper West

Kantstrasse 164, Berlin
View reference
View reference
approx. 59,700
QM GFA
LEED O+M
System

Upper Zeil, Frankfurt

Zeil 112-114, Frankfurt
View reference
View reference
approx. 19,000
QM GFA
LEED O+M
System

Deutschlandhaus Hamburg

Valentinskamp Hamburg
View reference
View reference
approx. 27,500
QM GFA
LEED BD+C: CS
System

SAP Potsdam

Nedlitzer Straße, Potsdam
View reference
View reference
approx. 57,500
QM GFA
LEED NC v2009
System

Enerparc Hamburg

HafenCity (Kirchenpauerstraße 26)
View reference
View reference
9,575.96
QM GFA
HafenCity Ecolabel, version 3.0
System

Opus 84 Hamburg

Baakenhafen District BF 84 Hamburg
View reference
View reference
approx. 27,500
QM GFA
HafenCity Eco-Label, version 3.0
System

Ipanema Hamburg

Überseering Hamburg
View reference
View reference
approx. 21,000
QM GFA
DGNB NBV15
System

Fuhle 101 Hamburg

Fuhlsbüttler Straße Hamburg
View reference
View reference
approx. 28,600
QM GFA
DGNB MIX15
System

Infinity Office Düsseldorf

Schwannstraße Düsseldorf
View reference
View reference
approx. 23,000
QM GFA
DGNB NBV15.2
System

Hermes Bluefield

Heilbronn, Mainz, Augsburg, Berlin-Southwest, Halle, Hamburg, Münster, Osnabrück
View reference
View reference
approx. 10,700 / 12,700
QM GFA
DGNB NLO15
System

Schönhauser Tor, Berlin

Torstraße 49, Berlin
View reference
View reference
approx. 18,800
QM GFA
BREEAM In-Use
System

PEER I Tabakquartier

Am Tabakquartier, Bremen
View reference
View reference
approx. 2070
QM GFA
DGNB Silver + QNG Plus
System

LUX I Tabakquartier

Am Tabakquartier, Bremen
View reference
View reference
approx. 2,070
QM GFA
DGNB Silver QNG Plus
System

Spreepalais am Dom, Berlin

Anna-Louisa-Karsch-Strasse 2, Berlin
View reference
View reference
approx. 25,000
QM GFA
BREEAM In-Use
System

ALVA I Tabakquartier

Am Tabakquartier, Bremen
View reference
View reference
approx. 2,900
QM GFA
DGNB New Construction + QNG
System

Tabakquartier

Am Tabakquartier, Bremen
View reference
View reference
approx. 193,000
QM GFA
DGNB Silver + QNG Plus
System

W2 Campus

Schockenriedstraße 39A-C, 70565 Stuttgart
View reference
View reference
BS 1+2: approx. 28,000, BS3: approx. 17,400, BS4: approx. 23,700
QM GFA
LEED Platinum
System

SUN Munich

Munich
View reference
View reference
31,905
QM GFA
DGNB New Construction
System

DMK Airport City Bremen

Bremen
View reference
View reference
approx. 21,533
QM GFA
DGNB New Construction
System

Seestern

Am Seestern 1, Düsseldorf
View reference
View reference
approx. 69,800
QM GFA
BREEAM In-Use
System

Frequently Asked Questions

Is LEED the right certification for our project?

This is the right choice if you need maximum flexibility in leasing and usage and want to keep your lease agreements free of restrictive requirements. It is also ideal if you use energy contracting models, target international tenants who define global space standards, or require English-language documentation. For portfolio and fund owners working with GRESB ratings, LEED is the gold standard. Inner-city locations with proximity to services and public transport are highly rated in the process.

This is not the right choice if you are targeting tenants looking for a higher standard of interior fit-out or if you intend to apply for QNG subsidies. In both cases, we will discuss DGNB certification with you.

Which certification would you recommend?

For new builds and renovations, Gold is the standard. Platinum is worthwhile for flagship projects and properties used by corporations themselves, as the costs can be cross-financed from other budgets.

When should we involve you?

Best in phase 2, before the designers sign their contracts. We then write the requirements into the contracts as a client brief, and you avoid redesign and double work. You can join as late as the end of phase 5 or 6 (HOAI), but it costs points in the rating.

How long is the certificate valid?

Indefinite. However, it becomes less meaningful over the years as legislation overtakes the standards that were in place at the time of certification.

Are there any difficulties in implementing US standards?

No. We only use English-language documents when dealing with the system provider or if you specify English as the contract language; otherwise, communication is in German. For the European market, the system provider accepts German and European standards as proof for many criteria, known as Alternative Compliance Paths. The exception is the Energy Model, which must be set up according to ASHRAE. We create this model ourselves and are familiar with the standards. From the upcoming version in summer 2027, it will no longer be a minimum requirement anyway, but an option.